Surprise! Some BRT stations and routes will be semi-operational this fall
Another piece of London’s bus rapid transit network (BRT) has gone from concept to reality.
The first rapid transit station is being assembled along the East London Link corridor at Ontario and King Streets.
Since arriving on Tuesday, the key component in the future BRT Network has been rapidly assembled.
“Over the next few weeks, we’ll be adding fiber, electrical, and other amenities," said Jennie Dann, director of construction and infrastructure services for the City of London.
But why the rush? After all, BRT is a long way from its 2027 completion date.
As it turns out, the city views the new eastbound Ontario at King Station as a test run.
“It is, like we mentioned, kind of the pilot,” shared Ardian Spahiu, the project manager overseeing the installation of all 45 stations.
Jennie Dann is director of construction and infrastructure services for the City of London. (Sean Irvine/CTV News London)
Spahiu expects as many as a dozen of them will be completed by the end of this year. He estimates each one has a price tag in the neighbourhood of $250,000.
All will have some big city transit amenities, including arrival/departure signage and more seating.
But CTV News London asked a key question yet to be answered — Will the new stations be heated in winter?
Dann says the answer is trending toward “Yes” for some high-passenger volume stops.
“We have future-proofed all of the shelters to be able to accommodate heating. We have identified some along the corridors where there is potentially a longer wait time.”
Spahiu said the new stations will also be equipped with 24/7 security to protect from frequent vandalism seen at existing transit shelters.
“We want to be monitoring these to minimize as much damage as possible," he said.
Earlier, Dann confirmed the BRT downtown loop and a section of bus-only lanes on King Street will be semi-operational this year, using existing buses.
Ardian Spahiu, an acting division manager with the City of London is overseeing the installation of all 45 BRT stations. (Sean Irvine/CTV News London)
“If you’re wondering when buses will start using this first shelter, we’re targeting the fall to see a bit more transit activity along the east London link corridor.”
But it will be 2027 before London’s new fleet of modern extended Rapid Transit buses are in use along the entire BRT Network.
It will encompass the Downtown Loop, East London Link, and the Wellington Gateway.
The city opted not to build BRT corridors in west and north London.
CTVNews.ca Top Stories
Asking rent prices up 9.3% across Canada, Ontario sees only decline: report
A new report says the average asking rent for a home in Canada in April was up 9.3 per cent compared with a year ago, while a slight month-over-month increase was also recorded for the first time since January.
What is basic income, and how would it impact me?
Parliamentarians are considering a pair of bills aiming to lift people out of poverty through a basic income program, but some fear these types of systems could result in more taxes for Canadians who are already financially struggling.
'I may have some nightmares:' Man survives being bitten by 2 sharks in Bahamas
A man who was bitten by two sharks in the Bahamas said Thursday he's 'thankful that I'm here' while sharing his story of survival.
Magnitude 4.2 earthquake reported off Vancouver Island's west coast
A 4.2-magnitude earthquake was recorded west of Vancouver Island early Friday morning.
Mexico's president accuses press and volunteer searchers for missing people of 'necrophilia'
The administration of Mexico's president has accused the press and volunteer searchers who look for the bodies of missing people of 'necrophilia,' comments that drew criticism this week.
WATCH Expecting an interest rate cut in June? Don't bet on it after new jobs data
Canada's labour market rebounded in April, adding more than 90,000 jobs, a staggering number of new positions after four consecutive months of little change.
Out-of-control wildfire burning near Fort McMurray
As of 9 a.m. on Friday, the wildfire burning 28 kilometres southwest of the northeastern Alberta city was 25 hectares in size.
Prince William says wife Kate is 'doing well'
Prince William said on Friday his wife Kate was 'doing well' in a rare public comment about the Princess of Wales as she undergoes preventative chemotherapy for cancer.
'Irate male' assaulted Newfoundland officers with block of cheese, police say
Police in Newfoundland say patrol officers were assaulted Thursday by a "very irate male" wielding a block of cheese.