Skip to main content

'Micro tunneling' under Wharncliffe Road will open capacity for development

Share

The City of London has brought in a massive drilling machine to tunnel under Wharncliffe Road.

It is part of a $7.3 million project.

“This micro tunneling machine is doing a section of this trunk sewer underneath Wharncliffe Road so that we can get this put in without any disruption to people using Wharncliffe,” explained Ashley Rammeloo, London’s director of water, wastewater and stormwater.

She continued, “It's part of an overall project to increase the trunk sewer size that goes between the Downtown and Greenway Wastewater Treatment Plant. This is important because it accommodates housing, infill and intensification in the downtown, as well as along Wellington Road and the rapid transit corridor. But it also takes more wet weather flow during those big rainstorms.”

The machine, belonging to Erritt Construction, has 10 cutting disks and is estimated to weigh more than 80,000 lbs and is worth more than $2 million.

Matt Poulias, site engineer with Erritt Construction, shows off the size of the massive drilling machine that will be used to tunnel under Wharncliffe Road in London, Ont. (Brent Lale/CTV News London)

“The head of the machine here, which is you can see in the red, it'll rotate slowly,” said Matt Poulias, site engineer for Erritt Construction.

“What ends up happening is, is we feed fresh water up into the system. The fresh water breaks up all the ground in front of the machine, and then the excavating machine falls into the head, and then it gets excavated through our slurry valves, sent back to the feeder separation plant where they get separated from our water. The solids get placed into our muck pit, and the water basically gets re-introduced back into the system to have a continuous flow,” he explained.

London Mayor Josh Morgan called it “a really important project” as it will triple the capacity from the area east of Wharncliffe Road to the Greenway Waste Treatment Plant.

The City of London is tunneling under Wharncliffe Road as part of a $7.3 million project. (Brent Lale/CTV News London)

“There’s a bottleneck to get between downtown and the Greenway plant,” said Morgan.

He continued, “It creates all sorts of challenges for us for infill development. It also creates challenges when we have heavy rain storms and water flows where we know that we run over capacity within the existing infrastructure and creates issues of flowing over into the stormwater system, and we can have overruns at the plant. So this is one of the steps for us to make it better environmental decisions, open up capacity and density for residential development as well.” 

A micro tunneling machine will be lowered into this hole as they will drill across Wharncliffe Road in London, Ont. (Brent Lale/CTV News London)

CTVNews.ca Top Stories

Should you wait to buy or sell your home?

The Bank of Canada is expected to announce its key interest rate decision in less than two weeks. Last month, the bank lowered its key interest rate to 4.7 per cent, marking its first rate cut since March 2020.

Tips for staying safe against blue-green algae this summer

With temperatures rising for the oncoming summer, many shutdowns due to the toxic blue-green algae has made for a tough time finding a safe spot to swim in the region – with one of the most recent shutdowns at Cunard Pond Beach in Halifax.

Stay Connected